Utilising the Bell UH1H, our experienced crew safely and efficiently airlifted 180x pallets of solar or 1721 panels for a 3.0 mega watt system. directly onto the rooftop from the staging area.

With lifts occurring every couple of minutes, the operation ensured a continuous workflow for the installation team, significantly reducing manual handling and crane setup time while maintaining strict safety and precision standards throughout the project.

The entire project was completed over a six hour period.

Project Location

Horsley Park, NSW

Client

AGILE Energy

See us in action